Gold Member Since 2013
Audited Supplier
Wuxi Suhang Machinery Manufacturing Co., Ltd.

Hydraulic Decoiler, Decoiler, Metal Decoiler manufacturer / supplier in China, offering for Metal Sheet Roll Forming Machine Hydraulic Decoiler, PU Insulation Sandwich Exterior Wall Panel, Steel Frame C Purlin Cold Forming Machine 7.5kw and so on.

(/ )

Supplier Homepage Product Spare parts for Metal Sheet Roll Forming Machine Hydraulic Decoiler

for Metal Sheet Roll Forming Machine Hydraulic Decoiler

FOB Price: US $15,000-50,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $15,000-50,000/ Set
Get Latest Price
Production Capacity: 10 Set/Per Month
Transport Package: Steel and Film
Payment Terms: L/C, T/T, D/P, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: various
  • Brand Name: Suhang
  • Weight: 5ton
  • Name: Hydraulic Decoiler
  • Package: Film and Steel
  • Trademark: Suhang
  • Origin: Wuxi, Jiangsu
  • Condition: New
  • Forming Speed: 5m/Min
  • Warranty: 1 Year
  • Place of Orgin: Wuxi, China
  • Delivery Time: 50 Days After Deposit
  • Specification: CE. SGS
  • HS Code: 8455229090
Product Description
Hydraulic Decoiler

Installation of the machine:
The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:
- Installation by Zhongji service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine:
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:
- Commissioning by Zhongji service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance

Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
NumberItemsUnit\TypeRF-HU
1Capacity of move dollyTon5
2Speedm/min5
3Liftingmm550
4Movingmm3000
5Hydraulic pressureMpa16
6Main Motor PowerKw10
7Air pressMpa0.9
8Capacity of uncoilerTon10
9Coil width mm Max 1500
Send your message to this supplier
Avatar
Miss Grace Jin
sales manager
*From:
To: Miss Grace Jin
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now