Gold Member Since 2013
Audited Supplier
Wuxi Suhang Machinery Manufacturing Co., Ltd.

3 Ton Hydraulic Decoiler with Car, 3 Ton Hydraulic Uncoiler with Car, Automatic Decoiler Machine manufacturer / supplier in China, offering Quality Ce&ISO 3ton Hydraulic Decoiler Without Coil Car, Cr12MOV Hydraulic Cutting Glazed Tile Cold Forming Machine 16 Stands, Galvanized Steel Glazed Tile Roll Forming Machine with Single Chain and so on.

(/ )

Supplier Homepage Product Spare parts Quality Ce&ISO 3ton Hydraulic Decoiler Without Coil Car

Quality Ce&ISO 3ton Hydraulic Decoiler Without Coil Car

FOB Price: US $7,000-8,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $7,000-8,000/ Set
Get Latest Price
Production Capacity: 10 Set/Per Month
Transport Package: Steel and Film
Payment Terms: L/C, T/T, D/P, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: SH-3T
  • Max Load Bearing: 1-3 Ton
  • Expansion: with 4 Palms, with Brake
  • Hydraulic Station: 4kw
  • Trademark: Suhang
  • Origin: Wuxi, Jiangsu
  • Name: 3 Ton Hydraulic Decoiler Without Coil Car
  • Max out Diameter of The Coil: 1200mm
  • Max Coil Width: 500mm
  • Motor Power: 5.5kw
  • Specification: CE, SGS, ISo9001
  • HS Code: 8455229090
Product Description
Quality CE&ISO 3Ton Hydraulic Decoiler Without Coil Car

1.Technical data:

Weight bearing: 1-3 tons
Coil inner Diameter: ¢450mm~550mm   
 Max out diameter of the coil: ¢1200mm
Expansion: with 4 palms, with brake
Max Coil Width: 500mm
Hydraulic station: 4kw 
Motor: 5.5kw

2.Installation of the machine

The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.

Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Zhongji service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

Send your message to this supplier
Avatar
Miss Grace Jin
sales manager
*From:
To: Miss Grace Jin
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now