Jiangsu, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
20
Year of Establishment:
2012-09-26
Management System Certification:
ISO 9001, ISO 9000, ISO 14064
OEM/ODM Service

Decoiler Machine, Hydraulic Decoiler, Hydraulic Decolier Machine manufacturer / supplier in China, offering Discount! Decoiler Machine for Decoiling Steel Sheet, Steel Step Tiles Roll Forming Machine [12 Months Warranty], Fully Automatic Step Tiles Cold Roll Forming Machine and so on.

Gold Member Since 2013
Audited Supplier
Supplier Homepage Products Spare parts Discount! Decoiler Machine for Decoiling Steel Sheet

Discount! Decoiler Machine for Decoiling Steel Sheet

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $10,000-50,000/ Piece
Production Capacity: 10 Sets/Month
Transport Package: Film and Steel
Payment Terms: L/C, T/T, D/P, Western Union
Forging Forming Method: Mold Forging
Condition: New
Brand Name: Suhang
Voltage: 380V
Power(W): 7.5kw
Weight: 5ton

You Might Also Like

Loading...

Basic Info

Model NO.: SHHD
Warranty: 1 Year
Capacity: 5t
Speed: 5m/Min
Trademark: Suhang
Specification: SGS. CE. ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090

Product Description

Decoiler Machine

Specification:
1. Diameter: 450mm~520mm
2. Max out diameter of the coil: 1300mm
3. Expansion: Hydraulic expansion, with 4 palms
4. Heads rotating: Hydraulic
5. Capacity: Max 5000/10000kgs per mandrel for each
6. Max Coil Width: 1220mm
7. Brake: Air brake
8. Safety cover for control box
9. Sensor: Air press arm sensor device

Installation of the machine:
The individual components of the machine are installed according to the layout and prepared for the commissioning.

Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine:
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
Number Items Unit\Type RF-HU
1 Capacity of move dolly Ton 5
2 Speed m/min 5
3 Lifting mm 550
4 Moving mm 3000
5 Hydraulic pressure Mpa 16
6 Main Motor Power Kw 10
7 Air press Mpa 0.9
8 Capacity of uncoiler Ton 10
9 Coil width mm   Max 1500
 

Send your message to this supplier

*From:
*To:
avatar Ms. April Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now