Jiangsu, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
20
Year of Establishment:
2012-09-26
Management System Certification:
ISO 9001, ISO 9000, ISO 14064
OEM/ODM Service

Hydraulic Coil Decoiler, Hydraulic Uncoiler, Roll Forming Machine manufacturer / supplier in China, offering Working Speed 40m/Min 20 Ton Hydraulic Decoiler, Steel Step Tiles Roll Forming Machine [12 Months Warranty], Fully Automatic Step Tiles Cold Roll Forming Machine and so on.

Gold Member Since 2013
Audited Supplier
Supplier Homepage Products Spare parts Working Speed 40m/Min 20 Ton Hydraulic Decoiler

Working Speed 40m/Min 20 Ton Hydraulic Decoiler

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $30,000-35,000/ Set
Port: Shanghai, China
Production Capacity: 10 Set/Per Month
Payment Terms: L/C, T/T, D/P, Western Union
Motor Powre: 30kw
Warranty: 12 Months
Delivery Time: 30 Days After Deposit
Loading Capacity: 20 Tons
Transport Package: Steel and Film
Specification: CE, SGS, ISO9001: 2008

You Might Also Like

Loading...

Basic Info

Model NO.: RF-DC
Trademark: Suhang
Origin: Wuxi, Jiangsu
HS Code: 8455229090

Product Description

Working Speed 30m/min 5 Ton Hydraulic Decoiler 

Produt Features:
1. Nice appearence.
2. Low noise.
3. High efficiency.
4. Good quality.
5. Esay control: PLC control with touch screen

Installation of the machine
The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:
- Installation by Suhang service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.

Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance

Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

Send your message to this supplier

*From:
*To:
avatar Ms. April Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now