Jiangsu, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
20
Year of Establishment:
2012-09-26
Management System Certification:
ISO 9001, ISO 9000, ISO 14064
OEM/ODM Service

3 Ton Decoiler, 3 Ton Hydraulic Decoiler, 3 Ton Manual Decoiler manufacturer / supplier in China, offering High Quality Durable High Speed 3ton Manual Hydraulic Decoiler Without Coil Car, Steel Step Tiles Roll Forming Machine [12 Months Warranty], Fully Automatic Step Tiles Cold Roll Forming Machine and so on.

Gold Member Since 2013
Audited Supplier
Supplier Homepage Products Spare parts High Quality Durable High Speed 3ton Manual Hydraulic Decoiler Without Coil Car

High Quality Durable High Speed 3ton Manual Hydraulic Decoiler Without Coil Car

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $1,000-3,500/ Set
Production Capacity: 10 Set/Per Month
Transport Package: Steel and Film
Payment Terms: L/C, T/T, D/P, Western Union
Coil Inner Diameter: 350-450mm
Max out Diameter: 800mm
Expansion: with 4paims with Brake
Max Coiler Width: 500mm
Specification: CE. SGS. ISO9001: 2008
Trademark: Suhang

You Might Also Like

Loading...

Basic Info

Model NO.: SH-3D
Origin: Wuxi, Jiangsu
HS Code: 8455229090

Product Description

Hydraulic Decoiler

Installation of the machine

The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.

Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Zhongji service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

Send your message to this supplier

*From:
*To:
avatar Ms. April Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now