Supplier Homepage Products Spare parts Working Speed 30m/Min 5 Ton Hydraulic Decoiler

Working Speed 30m/Min 5 Ton Hydraulic Decoiler

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $9,500-15,000/ Set
Production Capacity: 10 Set/Per Month
Transport Package: Steel and Film
Payment Terms: L/C, T/T, D/P, Western Union
Name: Hydraulic Decoiler
Loading Capacity: 5 Tons
Inner Diameter: 470-610mm
Coil Outside Diameter Max: 2000mm
Oil Cylinder Diameter: 120mm
Coil Width (Max): 1300mm

You Might Also Like

Loading...

Basic Info

Model NO.: RF-DC
Working Speed: 0-30m/Min
Motor Powre: 5.5kw
Hydraulic Power: 4kw
Trademark: Suhang
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090

Product Description

Working Speed 30m/min 5 Ton Hydraulic Decoiler 

Produt Features:
1. Nice appearence.
2. Low noise.
3. High efficiency.
4. Good quality.
5. Esay control: PLC control with touch screen

Installation of the machine
The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:
- Installation by Suhang service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.

Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc. )to the machine(control cabinet)
- Raw material, process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance

Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

Send your message to this supplier

*From:
*To:
avatar Ms. April Li
*Message:

Enter between 20 to 4,000 characters.